Fire Protection Systems

The best fire protection system is one that you do not have to think about once it is installed. From fire detection devices to extinguishers, FPT will create a design to meet the needs of your residential or commercial project. Services include:

  • Code compliance management
  • Product and materials lists
  • CAD files
  • BIM 3-D Coordination
  • hydraulic calculations
  • completed shop drawings
  • fabrication lists

Design Process

Most of our clients require a quick drawing for sprinkler system permitting, followed by fully coordinated installation drawings. We assure all projects undergo the processes below. We have developed efficient forms and methods of tracking all information.

Phase One

During this phase, our experienced consultants will acquire and examine the following:

  • Set of contract documents and specification
  • All required AutoCAD files
  • RFI Log
  • Current drawing log
  • Structural shop drawing
  • HVAC shop drawings
  • Electrical – light fixture submittals
  • Sub Contractor list – Contacts, Phone Numbers, Email Address, etc.
  • Any other necessary information

Phase Two

Adept at overseeing the administration of projects, FPT can help to “lighten your load” by submitting an “Information Request” and drafting any required letters or code information that can be forwarded to the General Contractor.

Phase Three

After thoroughly examining all details of your project, we work with you to develop a list of all materials and requirements for the project.

Phase Four

In this phase, we overlay the following information, organizing it into an easy to read drawing. Afterwards we examine various fire system designs to determine which will be the easiest to install and most cost effective.

Architectural Reflected Ceiling Cad Files

  • Ceiling elevations
  • Ceiling Types
  • Room Names and Numbers
  • Ceiling Profile Lines

Structural Cad Files

  • Overlay structure.

Plumbing Cad Files

  • Locate all applicable pipes.

HVAC Cad Files

  • Overlay duct
  • Check top and bottom elevations

Check VAV coil clearance

  • Indicate all major conduit locations and elevations
  • Locate all electrical panels
  • Locate all cable trays

Phase Five

Our consultants thoroughly examine every drawing before released to ensure that all of the plans adhere to project specifications, as well as applicable codes and requirements from authorities with jurisdiction.

Mobile Work Stations

A complete mobile work station for the survey of existing projects. In most cases the entire fire system project is designed and hydraulically calculated before we leave the site.

Coordination Meetings

A full color overlay with all trades detailing potential conflicts, as well as conflicts that may exist between other trades. This unique feature has proven to be invaluable on projects because it allows better project coordination. Many General Contractors tend to be repeat customers because of this tool. At FPT we are known for our ability to produce a coordination drawing, which can be easily followed. This document, with your title block, can be displayed in the project trailer to be referenced by all trades and used to resolve field coordination issues.

Product Submittals

Complete material submittal package provided in PDF format.